You open the crate. The parts look right. A quick caliper check confirms the critical dimensions. Then quality asks for the paperwork. The supplier sends a one-page Certificate of Conformance and little else. Heat numbers do not match any mill certificates-or there are no mill certificates at all. No dimensional data. No first-article package. No special-process records. The lot is rejected on the spot. Assembly stops. The schedule slips by weeks while you chase replacements or fight for a use-as-is disposition your customer will never approve.

This is a common and costly failure in aerospace CNC procurement. The physical parts are only half the deliverable. The other half is objective evidence that the material, processes, and tolerances meet the drawing and the applicable standards-evidence that survives AS9100 audits, source inspection, and potential FAA review. Below are the six inspection reports that should form the baseline of any aerospace CNC machining quality inspection package, plus a practical checklist you can drop into the next RFQ.

Why Inspection Reports Matter More Than the Parts Themselves

In aerospace, a nonconforming part that reaches the aircraft can ground fleets, trigger mandatory reporting, and expose the entire supply chain to liability. When a problem surfaces, the factory that cannot produce the records has no defense. Industry data from the American Society for Quality consistently places the cost of poor quality in the 10–20 % of sales range for many manufacturers; external failures (returns, customer rework, schedule hits) push the real number higher. In regulated work the multiplier is steeper.

The FAA continues to issue Unapproved Parts Notifications through its Suspected Unapproved Parts program. Incomplete or inconsistent documentation is one of the clearest red flags. A supplier that cannot show the chain of evidence is effectively transferring the risk to you.

What happens if a supplier can't show you the paperwork?

Best case: production stop and expensive expedited re-machining. Worst case: a quality escape that later appears in an audit or, far more seriously, in service. Experienced buyers treat missing reports as a disqualification, not a negotiation item.

Why Inspection Reports Matter More Than the Parts Themselves

Request these six documents by name on the purchase order and make delivery of the complete package a condition of payment.

First Article Inspection Report (AS9102)
AS9102 is the standard method for proving that the production process can repeatedly deliver a part that meets every design characteristic. A complete package contains three forms:

Form 1 – Part Number Accountability (identity, revision, serial or lot, organization, reason for the FAI).

Form 2 – Product Accountability (raw material, special processes, functional tests, each backed by certificate references).

Form 3 – Characteristic Accountability (every ballooned dimension, tolerance, note, and the measured result).

Practical note from the shop floor: never accept a partial or "delta" FAI for a new part number or a major process change. Full Forms 1–3 are the baseline.
What is a first article inspection report?

It is the documented proof that the first production article (or a defined sample) was manufactured and inspected against the engineering definition. In aerospace it is almost always executed and reported to AS9102.

Material Certificate (EN 10204 3.1) and Traceability
An EN 10204 Type 3.1 inspection certificate supplies actual chemical and mechanical results for the specific heat or cast, signed by the manufacturer's authorized inspection representative who is independent of production. The heat or lot number on that certificate must be traceable through the supplier's shop records all the way to the individual CNC parts. Without the link, the certificate is just paper.
What is a material test certificate?

It is the mill or material manufacturer's official statement of composition, mechanical properties, heat-treatment condition, and heat number. EN 10204 3.1 is the level most often required; Type 3.2 adds independent third-party verification when the program demands it.

Dimensional / CMM Inspection Report
This report pairs a ballooned drawing with measured values for every critical and major characteristic-actual results, tolerances, measurement method, and instrument identification. CMM data is preferred for complex geometry; other methods are acceptable when justified and documented.
What is a CMM inspection report?

A Coordinate Measuring Machine report that records three-dimensional measured values against the drawing requirements, normally linked to the balloon numbers on the inspection drawing.

Special Process Certificates
Heat treatment, anodizing, chemical conversion, non-destructive testing, plating, and painting must be performed by approved sources-preferably Nadcap-accredited when the specification or customer requires it. Each certificate should reference the process specification, the part number or lot, and the processor's approval status.

Certificate of Conformance (CoC)
A one-page statement that the parts conform to the purchase order, drawings, and applicable specifications. It needs a signature, date, drawing revision, and ideally the heat or lot number. A CoC without the supporting technical reports is incomplete.

Surface and Hardness Test Records (when applicable)
Surface roughness, hardness, conductivity, or coating-thickness measurements required by the drawing or process specification. These usually ride with the special-process certificates or appear on Form 2 of the AS9102 package.

One common pitfall: suppliers sometimes deliver a clean CoC and a dimensional report while quietly omitting heat-lot traceability or Nadcap evidence for a special process. Require the full set every time.

Which Reports Depend on Your Order Type

Order Type

AS9102 FAIR

Material Cert (3.1)

Dimensional / CMM

Special Process Certs

CoC

Surface / Hardness

Prototype / one-off

Full or customer-defined

Yes

Critical features

Yes if used

Yes

If specified

Small batch

Full or agreed delta

Yes

Sample or 100 %

Yes

Yes

If specified

Production / wholesale

Full on first article + sampling

Yes (every heat)

Sampling plan + key features

Yes

Yes

If specified

Wholesale aerospace CNC parts and custom aerospace CNC parts suppliers that routinely deliver this level of documentation show they understand the difference between "machined parts" and "aerospace-ready parts."

How to Tell If Your Supplier Is Serious About Quality

Certification is the starting line, not the finish. An AS9100 Certified CNC Machining Manufacturer should be able to open a sample report package within minutes. Ask for redacted examples of a recent AS9102 package, a material certificate with clear heat-to-part traceability, and a CMM report with its ballooned drawing. If the volume justifies it, walk the floor and watch how the quality records are controlled.

How do I verify a CNC supplier's quality?

Confirm current AS9100 registration on the IAQG OASIS database.

Request sample inspection reports before the first order.

Verify Nadcap accreditation for any special processes that will be used.

Check that material certificates carry heat numbers the supplier can actually link to finished parts.

Confirm calibrated inspection equipment with current certificates.

Ask how nonconformances are documented and dispositioned.

An aerospace CNC machining factory-and any aerospace CNC parts manufacturer-that treats these questions as routine is far more likely to protect both your schedule and your reputation.

Case Study: Sunhingstones

A Tier-2 customer needed a batch of titanium structural brackets for a landing-gear sub-assembly. The previous supplier delivered parts that passed a quick dimensional check but failed material verification. Heat-lot numbers on the mill certificates could not be traced to the finished parts, and the AS9102 package was incomplete. The lot was quarantined. Assembly stopped for three weeks while the customer scrambled for replacements and absorbed the schedule hit.

The re-order went to a new supplier with explicit documentation requirements: full AS9102 Forms 1–3 on the first article, EN 10204 3.1 material certificates with unbroken heat-to-part traceability, 100 % CMM of critical features on the first article and a defined sampling plan thereafter, Nadcap-accredited special-process certificates, and a signed CoC that referenced the exact drawing revision. The complete report package arrived with every shipment. Incoming inspection cleared the first article in two days. Subsequent lots moved through without delay. The customer kept the supplier for the remaining program releases. The machining itself was competent; the difference that saved the schedule was the evidence.

FAQ

Q: Which inspection reports are mandatory for aerospace CNC parts?

A: AS9102 First Article Inspection (when required by the program or customer), material certification with heat-lot traceability, dimensional inspection records, special-process certificates for any processes used, and a Certificate of Conformance form the practical minimum for production aerospace work.

Q: What is the difference between a CoC and a first article inspection report?

A: A CoC is a high-level statement of conformity. An AS9102 FAIR is a detailed, multi-form technical record that proves every design characteristic was met on the first article.

Q: Do prototype orders need AS9102?

A: Not always. Many customers accept a reduced package-dimensional report, material certificate, and CoC-for pure prototypes. Confirm the requirement on the purchase order; some programs still demand a full FAIR even for first articles.

Q: Can a small factory provide full inspection reports?

A: Yes. Capability depends on process discipline and calibrated equipment, not headcount. Many capable small shops deliver complete, professional packages; some large shops do not.

Q: How long does it take to get the reports after machining?

A: A well-organized supplier builds most of the package in parallel with machining. Complete reports are typically ready within a few days of final inspection; complex FAIR packages that include multiple special processes may take longer. Build the lead time into the schedule rather than treating documentation as an afterthought.

Request the six reports by name, verify that the supplier can produce sample packages, and treat incomplete paperwork as a nonconformance. That discipline sits at the center of effective aerospace CNC machining quality inspection.

Send Inquiry